Tuesday, June 7, 2011

Day 21 - Dad is awesome - Part 2

Even in 95 degree weather with extremely high humidity dad can still produce great work.
He knocked off 9 items off the list in 1 day.


This was the dresser that gave me some issues in a previous blog for not having all the correct holes to complete.

We continued on the closet again today, dad was able to get the organizer installed. We are about 50% done with it.


Trim should be completed tomorrow. If you look closely, you can see the organizer inside.
Here is a list that he was able to complete Monday:

1) Cable plate in family room
2) Door stop for back door (leading to deck)
3) Dimmer installed in dining room
4) 6 drawer dresser assembled
5) Organizer for closet installed
6) Door stop for left closet door installed
7) Fan inside guest bathroom oiled
8) Clock hands installed on coffee table in living room
9) Installed knobs on closet doors

Stay tuned, the progress will be getting more prevalent.

1 comment:

  1. Dad is awesome! What is his hourly rate. I have a list too!

    ReplyDelete